Dubuque, IA · CBSA 20220
Engineering Manager Salary in Dubuque
VerifiedPublished metro-area wages for engineering managers in Dubuque, IA, from the BLS OEWS May 2024 release — with the local distribution set against Iowa and the national benchmark.
Engineering Managers in Dubuque earn a median of $141,770 per year, per BLS OEWS May 2024. The middle 50% earn $141,770–$173,610; the top 10% earn $209,470. That is 15% below the national median and 3% above the Iowa median. BLS reports 220 employed locally.
Median wage
Verified$141,770
-15% vs national
Top 10% earn
$209,470
90th percentile
Employed in metro
220
Reliability Moderate (16.8% RSE)
Engineering Manager pay — Dubuque vs Iowa vs national
All three distributions are published BLS percentiles on a single shared scale.
| Percentile | Annual wage | vs national |
|---|---|---|
| 10th percentileentry / low | $127,190 | +14% |
| 25th percentile | $141,770 | +5% |
| Median50th percentile | $141,770 | -15% |
| 75th percentile | $173,610 | -16% |
| 90th percentiletop earners | $209,470 | -12% |
| Meanaverage | $159,630 | -9% |
How concentrated engineering managers are in Dubuque
Location quotient compares local concentration to the national rate. Above 1.00 means this metro employs the occupation more densely than the country overall.
Location quotient
2.72
Jobs per 1,000
3.71
Metro rank (pay)
#221 of 330
All engineering roles
$100,757
At a location quotient of 2.72, Dubuque is a genuine hub for this discipline — the occupation is roughly 2.7× as concentrated here as nationally, which usually means deeper employer competition and more lateral options.
Frequently asked questions
How much does a engineering manager make in Dubuque?
Does Dubuque pay more than the rest of Iowa?
Where does Dubuque rank nationally for engineering managers?
Source details
Published wage from BLS OEWS May 2024 for SOC 11-9041 (Architectural and Engineering Managers), Dubuque, IA (metro area).
Benchmarks come from published government wage data via BLS OEWS. Local and emerging-role figures are labeled estimates. Full methodology →