Kiryas Joel-Poughkeepsie-Newburgh, NY · CBSA 28880
Civil Engineer Salary in Kiryas Joel
VerifiedPublished metro-area wages for civil engineers in Kiryas Joel-Poughkeepsie-Newburgh, NY, from the BLS OEWS May 2024 release — with the local distribution set against New York and the national benchmark.
Civil Engineers in Kiryas Joel earn a median of $98,430 per year, per BLS OEWS May 2024. The middle 50% earn $80,920–$127,140; the top 10% earn $158,660. That is 1% below the national median and 4% below the New York median. BLS reports 420 employed locally.
Median wage
Verified$98,430
-1% vs national
Top 10% earn
$158,660
90th percentile
Employed in metro
420
Reliability Good (5.9% RSE)
Civil Engineer pay — Kiryas Joel vs New York vs national
All three distributions are published BLS percentiles on a single shared scale.
| Percentile | Annual wage | vs national |
|---|---|---|
| 10th percentileentry / low | $72,270 | +10% |
| 25th percentile | $80,920 | +3% |
| Median50th percentile | $98,430 | -1% |
| 75th percentile | $127,140 | -1% |
| 90th percentiletop earners | $158,660 | -1% |
| Meanaverage | $110,490 | +3% |
How concentrated civil engineers are in Kiryas Joel
Location quotient compares local concentration to the national rate. Above 1.00 means this metro employs the occupation more densely than the country overall.
Location quotient
0.70
Jobs per 1,000
1.61
Metro rank (pay)
#114 of 373
All engineering roles
$117,734
At a location quotient of 0.70, this occupation is thinner on the ground in Kiryas Joel than nationally. Pay can still be competitive, but the local employer pool is smaller.
Frequently asked questions
How much does a civil engineer make in Kiryas Joel?
Does Kiryas Joel pay more than the rest of New York?
Where does Kiryas Joel rank nationally for civil engineers?
Source details
Published wage from BLS OEWS May 2024 for SOC 17-2051 (Civil Engineers), Kiryas Joel-Poughkeepsie-Newburgh, NY (metro area).
Benchmarks come from published government wage data via BLS OEWS. Local and emerging-role figures are labeled estimates. Full methodology →