Grand Rapids-Wyoming-Kentwood, MI · CBSA 24340
Civil Engineer Salary in Grand Rapids
VerifiedPublished metro-area wages for civil engineers in Grand Rapids-Wyoming-Kentwood, MI, from the BLS OEWS May 2024 release — with the local distribution set against Michigan and the national benchmark.
Civil Engineers in Grand Rapids earn a median of $85,080 per year, per BLS OEWS May 2024. The middle 50% earn $69,650–$106,710; the top 10% earn $133,120. That is 15% below the national median and 1% below the Michigan median. BLS reports 700 employed locally.
Median wage
Verified$85,080
-15% vs national
Top 10% earn
$133,120
90th percentile
Employed in metro
700
Reliability Good (8.4% RSE)
Civil Engineer pay — Grand Rapids vs Michigan vs national
All three distributions are published BLS percentiles on a single shared scale.
| Percentile | Annual wage | vs national |
|---|---|---|
| 10th percentileentry / low | $60,600 | -8% |
| 25th percentile | $69,650 | -12% |
| Median50th percentile | $85,080 | -15% |
| 75th percentile | $106,710 | -17% |
| 90th percentiletop earners | $133,120 | -17% |
| Meanaverage | $92,310 | -14% |
How concentrated civil engineers are in Grand Rapids
Location quotient compares local concentration to the national rate. Above 1.00 means this metro employs the occupation more densely than the country overall.
Location quotient
0.54
Jobs per 1,000
1.25
Metro rank (pay)
#284 of 373
All engineering roles
$97,458
At a location quotient of 0.54, this occupation is thinner on the ground in Grand Rapids than nationally. Pay can still be competitive, but the local employer pool is smaller.
Frequently asked questions
How much does a civil engineer make in Grand Rapids?
Does Grand Rapids pay more than the rest of Michigan?
Where does Grand Rapids rank nationally for civil engineers?
Source details
Published wage from BLS OEWS May 2024 for SOC 17-2051 (Civil Engineers), Grand Rapids-Wyoming-Kentwood, MI (metro area).
Benchmarks come from published government wage data via BLS OEWS. Local and emerging-role figures are labeled estimates. Full methodology →